Resources & Documents
Airport Master Plan Documents
FAA Conditional Approval Letter (April 2026)
Draft Final Airport Master Plan (August 2025)
Draft Final Airport Master Plan - 51.1MB (August 29, 2025). The Draft Final Airport Master Plan is available for Agency review and public notice.
Appendix 1-10 (see link from July 2025; no changes)
Appendix 11 - 83.8MB - Public Records; updated to include comments from PAC members and the public from 07/23/25-08/06/25
Records A - D (see links from July 2025; no changes)
Record E - 11.7MB - Draft Final PAC and Public Comments (07/23/25-08/06/25)
Please note that these are large files and may take additional time to download.
-
Draft Final Airport Master Plan - 51.4MB (July 23, 2025). Public comments and input were collected through Wednesday, August 6, 2025.
Appendix 1-10 - 12.4MB
Appendix 1 - Glossary and List of Acronyms
Appendix 2 - Environmental Screening Report
Appendix 3 - Cultural Resource Review
Appendix 4 - Area Zoning Districts
Appendix 5 - Instrument Approach Departure Procedures
Appendix 6 - Airport Pavement Assessments
Appendix 7 - Airport Activity Data
Appendix 8 - UAO Discarded Forecast Models
Appendix 9 - UAO - Noise Contours Update
Appendix 10 - Solid Waste and Recycling
Appendix 11 - Public Records including public involvement summary, PAC meeting materials and public comments
Record A - 85.2MB
Public Involvement Summary
PAC Protocols
PAC Meeting & PAC Working Session Meeting Files
Public Open House
Public Surveys
Federal Aviation Administration (FAA) Correspondence
FAQs
Record B - 19.2MB - 2021, 2022, 2023 Public Comments
Record C - 142MB - 2024 Public Comments
Record D - 98MB - 2025 Public Comments
Record E - 11.7MB - Draft Final PAC & Public Comments (7/23/25 - 8/6/25)
Please note that these are large files and may take additional time to download.
-
Airport Layout Plan (ALP) - Full plan set 9.5MB (04/07/25)
Appendix A. ALP Review Checklist - 494KB (04/24/25)
Appendix B. Exhibit ‘A’ Review Checklist - 2.4MB (04/24/25)
Noise Contours (02/06/25)
Refined Preferred Alternative Summary (01/06/25)
Preferred Alternative Summary (10/15/24)
Refined Preliminary Alternatives Summary (08/01/24)
Preliminary Alternatives Summary (Updated 06/07/24)
-
Chapter 4 overview video - The video does not include the technical content found in the draft chapter, and it is only intended to guide the reader through their review of the chapter. (April 2024)
Chapter 4 - Draft Airport Facility Requirements (04/16/24)
Chapter 4 - Draft Airport Facility Requirements with FAA comments and responses (04/16/24)
-
Working Paper No. 1 includes Chapter 1: Introduction, Chapter 2: Existing Conditions, and Chapter 3: Aviation Activity Forecasts.
Draft Working Paper No. 1 (Nov. 2023)
UAO Forecast Approval - corrected (01/23/24)
Appendix 1 | Glossary and List of Acronyms
Appendix 2 | Environmental Screening Report
Appendix 3 | Cultural Resource Review
Appendix 4 | Area Zoning Districts
Appendix 5 | Instrument Approach and Departure Procedures
Appendix 6 | Airport Pavement Assessments
Appendix 7 | Airport Activity Data
Appendix 8 | Discarded Forecast Models
-
When the project team sends Working Paper No. 1 to the Federal Aviation Administration (FAA) for review, that is called a "review request" and then the FAA comments are provided. An updated document is then sent for review, etc.
Version 1 (Feb. 2022) - Draft Working Paper No. 1
FAA Review comments (03/03/22)
FAA Review Request (04/13/22)
Version 2 (May 2022) - Draft Working Paper No. 1
FAA Review Request (05/20/22)
FAA Review Comments (06/2022 - 08/2022)
Version 3 (Sep. 2022)
An updated working paper was not prepared in Version 3, instead a response to comments was provided in a memo to FAA for review.
Response to FAA comments (09/23/22; resent to FAA 12/13/22)
On 01/25/2023 FAA requested that the responses to FAA comments be incorporated into the Draft Working Paper No. 1. See Version 4 Feb. 2023.
Version 4 (Feb. 2023) - Draft Working Paper No. 1
Version 5 (Aug. 2023) Draft Working Paper No. 1
Appendix 8 (8/28/2023)
Version 6 (Nov. 2023) Draft Working Paper No. 1
UAO Forecast Approval (11/15/23) - See the "UAO Forecast Approval – corrected (1/23/24)" on the Resources Page
Reference Documents
Scope of Work - Review Presentation
Schedule (January 2025)
Frequently Asked Questions (FAQs)
Frequently Asked Questions (FAQ) (February 2024)
ODAV only endorses/supports data and statements that are released from this study and posted to this project website. All other statements by members of the Planning Advisory Committee and public are personal opinions. Other documents may not be endorsed by the ODAV because they are out of date, unless otherwise noted.
Public Testimony (video) toward UAO Master Plan during Board Meeting (December 5, 2024)
Aurora State Airport Assessment Report (2018)
Oregon Airport Land Use Compatibility Guidebook (2003)
Constrained Operations Runway Justification Study (2019)
Constrained Operations Runway Justification Study (2019) – FAA Forecast Approval Letter